Today I finished the
outline of the process the city goes through to develop a property. I worked on
the outline until my meeting with Kevin at 11:30 where we discussed what I had
so far. Kevin helped by adding little bits of information here and there that I
had missed and insured that what I had was accurate. He also gave me the 2001
Master Plan to look through to help me distinguish how the property came to be
of interest to the City of Durango. After the meeting I went back to my work
space and synthesized what we had talked about into words and put that into my
outline. I then took a break from the outline and started doing some very basic
sketches of what I think my conceptual design will look like. As you can see it’s
a little disorganized but I started exploring the GIS technology and this will
make my design much clearer.
At this point I only
have the boundaries of the Sherman Parcel and the Oxbow Park and Preserve but on
Monday I am going to start adding some of the basic pieces like the Roads and
the Railroad tracks and possibly parking lot on the Sherman Parcel.
These designs are not
final and do not reflect views of the City of Durango.
No comments:
Post a Comment